Amir, T (1986) Transient Response Analysis of a Dual Cycle System. Journal of Construction Engineering and Management, 112(03), 403–10.

Arditi, D and Albulak, M Z (1986) Line‐of‐Balance Scheduling in Pavement Construction. Journal of Construction Engineering and Management, 112(03), 411–24.

Bresnen, M J, Bryman, A E, Ford, J R, Beardsworth, A D and Keil, T E (1986) Leader Orientation of Construction Site Managers. Journal of Construction Engineering and Management, 112(03), 370–86.

Handa, V K and Barcia, R M (1986) Linear Scheduling Using Optimal Control Theory. Journal of Construction Engineering and Management, 112(03), 387–93.

Herbsman, Z (1986) SERC—A Model for Estimating Construction Inputs. Journal of Construction Engineering and Management, 112(03), 425–39.

  • Type: Journal Article
  • Keywords: Cost estimates; Project management; Statistics; Construction costs;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1986)112:3(425)
  • Abstract:
    One of the main problems in the process of design and management of construction projects is obtaining accurate information for preliminary estimates. This information is crucial for the development of integrated systems for construction management because of the relationship between construction input data and subjects such as estimating, cost control, scheduling, resource management, etc. Existing methods for estimating input that originated in industrial engineering are inadequate for the unique conditions of the construction industry. The model described in this paper applies statistical analysis of data from past projects, and enables the user to estimate the data needed for the construction of a new project. The model is based on the following components: Project items and their quantities; inputs needed to produce those items; and factors that affect inputs of a specific project. The model equation was calculated using multiple regression techniques. The paper concludes with a case study of a construction input configuration for a concrete structure.

Kagan, H A, Leary, D J and Pratter, G E K (1986) Design Engineers' Responsibilities During Construction. Journal of Construction Engineering and Management, 112(03), 394–402.

Karaa, F A and Nasr, A Y (1986) Resource Management in Construction. Journal of Construction Engineering and Management, 112(03), 346–57.

Thomas, H R and Bluedorn, A C (1986) Case Study of Organizational Changes. Journal of Construction Engineering and Management, 112(03), 358–69.

W. L., S, Rybel, V W and Cochran, L (1986) Dewatering for Opal Springs Powerhouse Excavation. Journal of Construction Engineering and Management, 112(03), 440–51.

William C., I (1986) Future Directions for Computerized Construction Research. Journal of Construction Engineering and Management, 112(03), 326–45.

Wong, T K and Logcher, R D (1986) Contractors in Cyclical Economic Environments. Journal of Construction Engineering and Management, 112(03), 310–25.